Find the Production Bottleneck Before Adding Capacity
Updated: Oct 21
By Paul Krzywicki, founder of Lynden Business Partners
Orders are waiting, the floor looks busy, and the obvious answer seems to be more equipment or another shift. Before committing, identify what is actually limiting completed output.
A busy production process can still have a single station that determines how much work reaches the customer. Adding capacity elsewhere may increase work in progress while leaving that constraint unresolved.
Follow the work through the business
Trace the critical path from an order entering production to the finished order leaving the door. Look at where work waits, where queues build, and what causes the constrained station to stop or run below its useful capacity.
Speak with operators and supervisors. Compare the schedule with what actually happens. Look at changeovers, the sequence of jobs, readiness of inputs, and how existing automation is being used.
An example from operating experience
In a previous manufacturing role, Paul and the team traced the critical path through production and identified the station limiting overall output. By reviewing scheduling and underused production automation, they identified an opportunity to increase throughput by 10%.
Putting the changes into practice helped more orders go out the door, improved labour utilization, and increased profit.
This example reflects Paul's operating experience before founding Lynden Business Partners.
Connect the operational change to the business result
The useful question is how a change affects the whole operation. Track completed output, delivery performance, labour use, quality, and the margin on the work being shipped.
Faster activity at one station is useful when it helps the business complete the right work. Compare results over comparable periods and consider changes in product mix and demand.
Start with a practical test
Identify the station limiting output and establish a baseline.
Review its schedule and the causes of lost productive time.
Test a focused change using the equipment and information already available.
Measure the effect on completed orders and the business result.
Keep, refine, or replace the change based on what the team learns.
Sometimes new capacity is the right decision. Understanding the constraint first gives that decision a stronger foundation.